Sintered stone—especially large-format sintered stone slabs—has become a defining material in contemporary architecture and interior design. However, its characteristics of being large, thin, and brittle place extremely high demands on handling, fabrication, and installation techniques.

Following a standardized, professional installation process is the only way to ensure long-term performance, safety, and visual perfection.


Phase 1: Pre-Installation Preparation (Preparation Is Key)

A solid installation starts long before the slab touches the wall or floor. Thorough preparation determines more than 50% of the final success.


1. Professional Tools Are Non-Negotiable

Handling & Transportation

  • Always use professional slab transport frames (A-frames) combined with heavy-duty vacuum suction cups.

  • Single-person handling or improvised tools are strictly prohibited, as uneven stress distribution can easily cause slab breakage.

Cutting & Drilling

  • Use dedicated sintered stone cutting machines or high-quality manual cutting systems with continuous-rim or turbo diamond blades.

  • For drilling, only diamond core bits with water cooling should be used.

  • At internal corners or cut-outs, rounded transition holes (R-angles) must be drilled first before cutting to disperse stress and prevent future cracking.

Installation Tools

Prepare:

  • Notched trowels (tooth size selected based on slab size and substrate flatness)

  • Vibrating tools or rubber mallets

  • Leveling systems

  • Vacuum lifters


2. Substrate Inspection & Surface Preparation

The substrate must be:

  • Structurally sound

  • Flat

  • Clean

  • Dry

Flatness requirement:
Using a 2-meter straightedge, deviation must be ≤ 3mm. Any uneven areas must be pre-leveled with cement-based mortar.

Additional requirements:

  • Remove dust, oil, release agents, and contaminants.

  • For high-absorption substrates (e.g., aerated concrete), apply a bonding primer to prevent premature water absorption from the adhesive.


3. Choosing the Right Adhesive

🚫 Ordinary cement mortar is strictly forbidden.

Why?

  • High shrinkage rate

  • Insufficient bonding strength

  • Incompatible with sintered stone’s near-zero water absorption

Mandatory requirement:
Use high-flexibility, premium tile adhesive, rated at least C2 S1 under EN standards.

  • C2: Enhanced adhesion

  • S1: Deformable (flexible), capable of absorbing thermal and structural movement


Phase 2: Core Installation Process

1. Double Buttering Method (Mandatory)

Back of the Slab

  • Clean off release dust.

  • Apply a thin, full-coverage layer of adhesive or dedicated back-buttering compound using a notched trowel.

Substrate Application

  • Apply adhesive to the wall or floor using a notched trowel.

  • Comb adhesive in one consistent direction (horizontal or vertical).

📌 Double buttering ensures 100% contact, eliminates air pockets, and prevents hollow spots.


2. Placement & Adjustment

  • Lift the slab into position using transport frames.

  • Gently press into the adhesive bed.

  • Use a vibrating tool from the center outward, or a rubber mallet with a protective block, to expel air and distribute adhesive evenly.

  • Before initial curing, adjust flatness using a leveling system.

Joint spacing recommendation:
Leave 1.5–3mm joints to accommodate thermal movement.


3. Jointing & Grouting

  • Jointless installation is not allowed.

  • All materials expand and contract; no joints will lead to warping or cracking.

  • After at least 24 hours, proceed with joint filling.

Recommended materials:

  • Epoxy grout

  • High-quality joint sealants

These offer superior:

  • Waterproofing

  • Stain resistance

  • Long-term durability


Phase 3: Special Details & Post-Installation Protection

1. External Corners (Edges)

  • Use 45° mitered “begonia edge” joints instead of simple butt joints.

  • This technique:

    • Creates space for grout

    • Improves impact resistance

    • Enhances visual continuity


2. Finished Surface Protection

  • For at least 72 hours, prohibit foot traffic, heavy loads, or impact.

  • Cover installed surfaces with protective film or cardboard to prevent damage during follow-up construction.


3. Cleaning & Long-Term Maintenance

  • After full curing, clean using water and neutral detergents only.

  • Daily maintenance is simple—wipe with a damp cloth.

  • No waxing, sealing, or special treatment required.


Conclusion: Professional Installation Is the Key to Long-Term Success

Installing sintered stone is a precision-driven professional process. Selecting an experienced installation team, using certified tools and materials, and strictly following standardized procedures ensures:

  • Structural safety

  • Visual perfection

  • Long-term durability

  • Zero after-sales issues

A single professional installation allows the full beauty and performance of sintered stone to shine for decades.